Deck Demo Day 2

So i wrapped up the second part of the deck demolition today. Took me quite a bit longer this time then last. I think this part of the deck was in better shape, thus much heavier. Once Kelly got home it only took about another ten minutes to wrap everything up.

Tomorrow sometime Lowe’s will be delivering our new patio tiles and the sand and rock for the installation. So Saturday we will get underway. Hopefully it will only take two days so I can enjoy the holiday on Monday. We will see, I think my boss may be out on Monday so I’m not sure if I’m on the hook for meetings. I would assume our customer has the day off as well, but HP is sometimes weird about holidays.

This entry was posted in General and tagged . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *